Activity

  • taimoor_2 posted an update 5 years, 9 months ago

    @emgsconnected i have got my visa approval letter and i downloaded my eVAL yesterday. At the time my eVal was available for download the tracker showed 75% green however today the tracker shows 80% and is yellow, asking for further documentation. The eVAL download option is still there and i can download my eVAL. i have attached the screenshot below. Does the issues listed in the screenshot need to be resolved now or after i reach Malaysia? Please clarify and guide. Thanks

EMGS Mobile App sends all this cool content straight into your pocket. You should absolutely install it!
© 2021 EMGS. All Rights Reserved.

Log in with your credentials

or    

Forgot your details?

Create Account